|
Line 5 is a underground light metro line in Milan, Italy. The line is part of the Milan Metro and serves the north-eastern suburb of the city. The first stage of the line, covering the from Bignami to Zara opened on 10 February 2013. The second stage, from Zara to Garibaldi FS, opened on 1 March 2014. The third stage, from Garibaldi FS to San Siro Stadio opened on 29 April 2015, with some intermediate stations not in service at that time; as of November 2015, all the stations have been opened. The line operates using AnsaldoBreda Driverless Metro vehicles, the same of the Copenhagen Metro. The line is being built by the ''Metro 5 SpA'' consortium. The consortium signed the contract for construction of the Porta Garibaldi to San Siro section on 2 February 2011. ==Route== Milan Metro · Line 5 The line, long with 19 stations, runs from San Siro Stadio to Bignami. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Milan Metro Line 5」の詳細全文を読む スポンサード リンク
|